Home LMTC My layout Evolution (layout) Evolution (photos) Clublayout Tips Rolling stock V100
Switch tower Tunnel entrance

2.2. Clublayout


The clublayout is constructed the same way as my home layout : segments,  consisting of  4 boxes so far, each 150cm long and  80 cm of width. The layout represents a small loc depot, 1 acces track and 7  stage tracks.

We only used Hegob rails because they still have a double slip switch with a radius of more than 2000mm, namely 3000mm.

The switch motorisation is described under Tips.


clubbaan-01-2009-2clubbaan-01-2009-4clubbaan-01-2009-3






Home Top LMTC My layout Evolution (layout) Evolution (photos) Clublayout Tips Rolling stock V100
Switch tower Tunnel entrance